NO | PROJECT NAME/DESCRIPTION | CLIENT | START/FINISH DATE |
---|---|---|---|
1 | Design Review and Construction Supervision of Infrastructure Components in Ilala Municipality under the Dar es Salaam Metropolitan Development Project (DMDP): Development project for the upgrading of basic infrastructure as well as the provision of new community facilities in low income settlements, including roads, storm water, community markets and community parks, foot bridges, skip waste facilities, public toilets and water kiosks. | ILALA MUNICIPAL COUNCIL | JUNE 2016-MAY 2022 |
2 | Provision of Consultancy Services for Preparation/Updating of Subproject Designs, Environmental Impact Assessment, Resettlement Action Plan, Cost Estimates and Bidding Documents for the rehabilitation of Proposed TSCP AF2 Works in Tanga, Arusha, Mwanza, Ilemela, Dodoma, Mtwara, Mbeya and Kigoma City/Municipality under the Tanzania Strategic Cities Project (TSCP): • New construction / upgrading / rehabilitation of roads to asphalt concrete (bitumen surfacing); including vertical and horizontal alignment, pavement design, concrete bridges, drainage structures, streetlights, traffic lights, etc. • Construction of lined stormwater drains; including alignment and structural designs etc. for flood control in the central business district (CBD). • Design of Sanitary Landfill; including creation of additional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. • Design of a new market, a new bus stand and a new lorry parking area; including pavement design, concrete interlocking paving block surfacing, lighting, drainage and other associated structures. | PMO-RALG | AUG 2016-JULY-2017 |
3 | Updating/Preparation of Detailed Engineering Design, Cost Estimates and Bidding Documents for Proposed Additional Sub-Projects in Tanga, Arusha, Mwanza, Ilemela and Kigoma City/Municipality under the Tanzania Strategic Cities Project (TSCP) • New construction / upgrading / rehabilitation of approximately 45 km of roads to asphalt concrete (bitumen surfacing); including vertical and horizontal alignment, pavement design, concrete bridges, drainage structures, streetlights, traffic lights, etc. • Construction of approximately 2 km of lined stormwater drains; including alignment and structural designs etc. for flood control in the central business district (CBD). • Rehabilitation and expansion of dumpsite; including creation ofadditional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. | PMO-RALG | JUNE 2014-MAR 2016 |
4 | Preliminary and Detailed Engineering Designs, Cost Estimates and Bidding Documents, and ESIA for the Investment Sub-Projects in Tanga City and Arusha Municipality under the Proposed TSCP • New construction / upgrading / rehabilitation of approximately 40 km of roads to asphalt concrete (bitumen surfacing); including vertical and horizontal alignment, pavement design, concrete bridges, drainage structures, streetlights, traffic lights, etc. • Construction of approximately 8.3 km of lined stormwater drains; including alignment and structural designs etc. for flood control in the central business district (CBD). • Rehabilitation and expansion of dumpsite; including creation of additional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. • Acquisition of a package of solid waste management equipment (skip loaders, buckets, tipper / trucks, hand refuse street containers, compactors, weighbridge, etc.). • Design of a new bus stand (36,708 m²) and a new lorry parking area (29,952 m²); including pavement design, concrete interlocking paving block surfacing, lighting, drainage and other associated structures. | PMO-RALG | AUG 2009-MAY 2010 |
5 | Preliminary and Detailed Engineering Designs, Cost Estimates and Bidding Documents, and ESIA for the Investment Sub-Projects in Mwanza City and Kigoma Municipality under the Proposed TSCP • Upgrading of approximately 25 km of existing earth and gravel roads to (bitumen surfacing); including vertical and horizontal alignment, pavement design, drainage structures, streetlights, etc. • Upgrading of approximately 30 km of existing earth and gravel roads to asphalt surfacing (bitumen surfacing); including vertical and horizontal alignments, pavement design, drainage structures, streetlights, etc. • Construction of one (1) main bus stand (30,000 m²) and two (2) town bus stands (25,000 m²); including pavement design, concrete interlocking paving block surfacing, lighting, drainage, buildings and other associated structures. • Construction of approximately 3,500 linear metres of lined stormwater drains at different locations within Kigoma municipality; including alignment and structural designs etc. • Construction of a dumpsite for solid waste disposal; including creation of cells, construction of inner and access roads, protection works, stormwater drains and leachate discharge facilities and town waste collection centres; all to meet environmental requirements with necessary mitigation measures or provide alternative. • Acquisition of a package of solid waste management equipment (skip loaders, skip buckets, tippers / trucks, refuse collection points, wheel loader, etc.) | PMO-RALG | AUG 2009-MAY 2010 |
6 | Consultancy Services for Infrastructure Upgrading in Unplanned Settlements in Dar Es Salam in Support of Preparation of the Proposed DMDP; Tanzania Strategic Cities Projects: Development project for the upgrading of basic infrastructure as well as the provision of new community facilities in low income settlements, including roads, stormwater, community markets and community parks, foot bridges, skip waste facilities, public toilets and water kiosks. | PMO-RALG | SEPT 2012-DEC 2014 |
7 | Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Arusha City Under the TSCP-Additional Financing (AF) New construction / upgrading / rehabilitation of roads to asphalt concrete drainage structures, streetlights, lined stormwater drains for flood control, dumpsite; including creation of additional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. | PMO-RALG | JUNE 2016-MAY 2017 |
8 | Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Tanga City Under the TSCP-Additional Financing (AF) New construction / upgrading / rehabilitation of roads to asphalt concrete drainage structures, streetlights, lined stormwater drains for flood control and dumpsite. | PMO-RALG | JUNE 2016-MAY 2017 |
9 | Design Review Construction Supervision of Urban Infrastructure Development in Tanga City under Tanzania Strategic Cities Project (TSCP) New construction / upgrading / rehabilitation of roads to asphalt concrete drainage structures, streetlights, lined stormwater drains for flood control and dumpsite. | PMO-RALG | OCT 2011-SEPT 2013 |
10 | Design Review Construction Supervision of Urban Infrastructure Development in Arusha City under Tanzania Strategic Cities Project (TSCP) New construction / upgrading / rehabilitation of roads to asphalt concrete drainage structures, streetlights, traffic lights, lined stormwater drains for flood control, dumpsite; including creation of additional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. | PMO-RALG | DEC 2013-MAY 2014 |
11 | Feasibility Study, Detailed Engineering Design, Environmental and Social Impact Assessment and Preparation of Bidding Documents for One-Stop Inspection Station at Mikumi, Makambako and Mpemba along Dar es Salaam Corridor. • Planning for infrastructure for the OSIS to enhance easy and fast provision of services; • Design of civil works, Weighbridge Station and facilities at the proposed site; • Design of ICT infrastructure that enable stakeholders at the OSIS to post and share; and • Capacity Building; on job training to improve the technical skills of the Client. | TANROADS | MAR 2016-NOV 2017 |
12 | Construction Supervision Consultancy Services for Urban Infrastructure Development in Arusha City Under the TSCP-Second Additional Financing (AF2) New construction / upgrading / rehabilitation of roads to asphalt concrete drainage structures, streetlights, lined stormwater drains for flood control, dumpsite; including creation of additional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. | PMO-RALG | JUNE 2018- ONGOING |
13 | Construction Supervision Consultancy Services for Urban Infrastructure Development in Tanga City Under the TSCP-Second Additional Financing (AF2) New construction / upgrading / rehabilitation of roads to asphalt concrete drainage structures, streetlights, lined stormwater drains for flood control, dumpsite; including creation of additional cells, construction of inner roads, stormwater drains and leachate stabilisation ponds. | PMO-RALG | JUNE 2018-MAR 2020 |
14 | Consultancy Services for Preparation/Updating of Engineering Designs, cost Estimates and Bidding Documents for Road Projects in Kinondoni Municipality Financed under Own Source Collection and Road Fund Revenue. It involves design of a several roads and concrete box culvert and construction supervision. The aim was to increase connectivity and hence reduce traffic congestion. | TARURA(KINONDONI MUNICIPALITY) | OCT 2017-SEP 2018 |
15 | Updating of Pavement Design, Cost Estimates, Economic Evaluation Report and Tender Documents for Upgrading of Mbinga – Mbamba Bay Road to Bitumen Standard Including Design of Litembo Hospital Link Road, Maguu Health Center Link Road, and Accesses/Junctions to Nyasa District Administrative Offices. | TANROADS | MAR 2015-APR 2016 |
16 | Upgrading of Jet Corner – Vituka - Davis Corner (10.3km) to bitumen standard. | TANROADS | FEB 2010-JAN 2011 |
17 | Feasibility Study, Environmental and Social Impact Assessment and Detailed Engineering Design for Upgrading of Dar-es-Salaam Outer Ring Road linking Bagamoyo, Morogoro and Nyerere Roads to Bitumen Standard. | TANROADS(RMO) | NOV 2007-MAY 2008 |
18 | Detailed Design of the Malagarasi Bridge and Approach Roads: Detailed Engineering Design of the Bridge (100m span) on the Simbo – Illagala – Kayla regional road in the Kigoma region including the Asphalt surfaced approach road, EMP and RAP, preparation of tender documents, tender administration and supervision of construction works. | TANZANIAN ROADS AUTHORITY | JUNE 2008-NOV 2009 |
19 | Design Review and Updating of ESIA, RAP and Tender Documents for Upgrading of Tanga-Horohoro Road to Bitumen Standard and for Tanga-Horohoro River Bridge: Technical Audit / Design Review and Updating of Detailed Design and Cost Estimates, Environmental and Social Impact Assessment (ESIA), Resettlement Action Plan (RAP) and Preparation of Tender Documents for Upgrading of Tanga-Horohoro Road (68km) to Bituminous Surfaced Standard. | TANZANIAN ROADS AUTHORITY | DEC 2008-MAR 2009 |
20 | Consultancy Services for the Supervision of Works for the Expansion of Lower Ruvu Water Treatment Plant (WTP) in Tanzania: Provision of technical assistance to MCA-T and implementing entity (DAWASA and DAWASCO), Overall project management and acting as the Engineer in terms of FIDIC Contract, Site supervision of the construction works | MILLENNIUM CHALLENGE ACC TANZANIA(MCC) | JAN 2011-FEB 2015 |
21 | Programme Coordination and Technical Assistance to MCA-T, DAWASA, DAWASCO and MORUWASA and for Construction Supervision Services for the Non-Revenue Water Activity: Assistance with financial management, tariff determination, asset management, unaccounted for water, technical review of design reports for infrastructure and with the management of the capital investment programme, as well as provision of construction supervision for various projects. | MILLENNIUM CHALLENGE ACC TANZANIA(MCC) | JULY 2009-AUG 2013 |